Multiple Choice
A company produces three types of bookcases: 4-shelf metal, 6-shelf metal, and 4-shelf wooden. The 4-shelf metal bookcase requires 2.5 hours for fabrication, one hour to paint, and one-half hour to package for shipping.
The 6-shelf bookcase requires 4 hours for fabrication, 1.5 hours to paint, and one-half hour to package. The
Wooden bookcase requires 3 hours to fabricate, 2 hours to paint, and one-half hour to package. The daily
Number of hours available for each phase of production are: 167 for fabrication, 81 for painting, and 26 for
Packaging. How many of each type of bookcase can the company produce in one day?
A) 14 4-shelf metal, 18 6-shelf metal, and 204 -shelf wooden
B) 14 4-shelf metal, 16 6-shelf metal, and 18 4-shelf wooden
C) 16 4-shelf metal, 18 6-shelf metal, and 184 -shelf wooden
D) 164 -shelf metal, 16 6-shelf metal, and 204 -shelf wooden
Correct Answer:

Verified
Correct Answer:
Verified
Q103: <span class="ql-formula" data-value="\left\{ \begin{array} { l }
Q104: Find the solution or solutions, if
Q105: Decide whether or not matrix A
Q106: Solve the system graphically.<br>- <span class="ql-formula"
Q107: A basketball fieldhouse seats 15,000. Courtside seats
Q109: first two games of the season.
Q110: Find the inverse matrix of A.<br>-If
Q111: Some people must eat a low-sodium diet
Q112: A matrix has an inverse if
Q113: <span class="ql-formula" data-value="\left\{ \begin{array} { l }