Multiple Choice
Solve the linear programming problem.
-A summer camp wants to hire counselors and aides to fill its staffing needs at minimum cost. The average monthly salary of a counselor is $2400, and the average monthly salary of an aide is $1100.
The camp can accommodate up to 35 staff members and needs at least 20 to run properly. The
Camp must have at least 10 aides and may have up to 3 aides for every 2 counselors. How many
Counselors and how many aides should the camp hire to minimize cost?
A) 13 counselors and 16 aides
B) 19 counselors and 23 aides
C) 8 counselors and 12 aides
D) 13 counselors and 17 aides
Correct Answer:

Verified
Correct Answer:
Verified
Q30: Solve the system in terms of
Q31: Use a graphing calculator and the
Q32: Solve the problem.<br>-A <span class="ql-formula"
Q33: Use the Gauss-Jordan method to solve
Q34: Write the augmented matrix for the
Q36: Find the partial fraction decomposition for
Q37: If the system has infinitely many
Q38: Find the partial fraction decomposition for
Q39: Find the values of the variables
Q40: Solve the system by substitution.<br>- <span