Multiple Choice
Solve Problems Using Systems in Three Variables
-A ceramics workshop makes wreaths, trees, and sleighs for sale at Christmas. A wreath takes 3 hours to prepare, 2 hours to paint, and 10 hours to fire. A tree takes 16 hours to prepare, 3 hours to paint, and 4 hours to fire. A sleigh takes 4 hours to prepare, 13 hours to paint, and 7 hours to fire. If the workshop has 114 hours for prep time, 79 hours for painting, and 108 hours for firing, How many of each can be made?
A) 6 wreaths, 5 trees, 4 sleighs
B) 5 wreaths, 4 trees, 6 sleighs
C) 4 wreaths, 6 trees, 5 sleighs
D) 7 wreaths, 6 trees, 5 sleighs
Correct Answer:

Verified
Correct Answer:
Verified
Q236: Solve Problems Using Systems of Nonlinear
Q237: Solve Problems Using Systems of Linear
Q238: Solve Problems Using Systems in Three Variables<br>-Ron
Q239: Solve Problems Using Systems of Nonlinear
Q240: Solve Problems Using Systems of Linear
Q242: Solve Linear Systems by Substitution<br>- <span
Q243: Write the partial fraction decomposition of
Q244: Solve Nonlinear Systems By Addition<br>-x2 - 3y2
Q245: Solve Systems of Linear Equations in
Q246: Solve Systems of Linear Equations in