Create a confidence interval for the slope of a regression equation.
-An operations manager was interested in determining if there is a relationship between
The amount of training received by production line workers and the time it takes for them
To trouble shoot a process problem. A sample of 15 recently trained line workers was
Selected. The number of hours of training time received and the time it took (in minutes)
For them to trouble shoot their last process problem were captured. The regression output
Is shown below. The 95% confidence interval for the slope of the regression equation is The regression equation is
Trouble Shooting Training
A) -4 to 0.32
B) -1.9776 to -1.7224
C) -2.1332 to -1.5388
D) -3.611 to -0.069
E) None of the above.
Correct Answer:

Verified
Correct Answer:
Verified
Q6: Interpret a confidence interval for the slope
Q6: Consider the following to answer the question(s)
Q9: Is there a significant relationship between sales
Q10: Check assumptions / conditions for inferences in
Q12: Test for association.<br>-As the carbon content in
Q13: Interpret regression output.<br>-A sales manager was
Q17: Use the following for questions <br>An
Q23: Consider the following to answer the question(s)
Q23: Consider the following to answer the question(s)
Q31: Consider the following to answer the question(s)