Multiple Choice
Solve the problem.
-A contractor mixes concrete from bags of pre-mix for small jobs. How many bags with 5% cement should he mix with 14 bags of 14.5% cement to produce a mix containing 12% cement?
A) 24 bags
B) 5 bags
C) 19 bags
D) 7 bags
Correct Answer:

Verified
Correct Answer:
Verified
Related Questions
Q135: The solution set of the system
Q136: Solve the system.<br>- <span class="ql-formula" data-value="\frac
Q137: Find the dimension of the matrix.<br>-
Q138: Solve the equation for x.<br>- <span
Q139: Provide an appropriate response.<br>-Which one of
Q142: Twice the water flow in the hot-water
Q142: Find the cofactor of the indicated
Q143: Use Cramerʹs rule to solve the
Q144: Solve the system for x and
Q145: Solve the system by substitution.<br>- <span