Multiple Choice
A man lifts a 20.0-kg bucket of concrete from the ground up to the top of a 30.0-m tall building. The bucket is initially at rest, but is traveling at 4.0 m/s when it reaches the top of the building. How much work was done by the man in lifting the bucket?
A) 5.88 kJ
B) 600 J
C) 760 J
D) 6.04 kJ
E) 160 J
Correct Answer:

Verified
Correct Answer:
Verified
Q9: Two men, Joel and Jerry, push against
Q19: If the work done to stretch a
Q22: You slam on the brakes of your
Q39: FIGURE 7-4 <img src="https://d2lvgg3v3hfg70.cloudfront.net/TB3817/.jpg" alt="FIGURE 7-4
Q41: An airplane flies 120 km at a
Q43: If the net work done on an
Q43: A weight of 200 N is hung
Q45: A constant force <img src="https://d2lvgg3v3hfg70.cloudfront.net/TB3817/.jpg" alt="A constant
Q46: If the net work W is done
Q48: A force can be exerted on an