Multiple Choice
Solve the problem.
-A ceramics workshop makes wreaths, trees, and sleighs for sale at Christmas. A wreath takes 3 hours to prepare, 2 hours to paint, and 9 hours to fire. A tree takes 14 hours to prepare, 3 hours to paint, and 4 hours to fire. A sleigh takes 4 hours to prepare, 14 hours to paint, and 7 hours to fire. If the workshop has 86 hours for preparation time, 66 hours for painting, and 91 hours for firing, how many of each can be made?
A) 4 wreaths, 3 trees, 6 sleighs
B) 3 wreaths, 6 trees, 4 sleighs
C) 7 wreaths, 5 trees, 4 sleighs
D) 6 wreaths, 4 trees, 3 sleighs
Correct Answer:

Verified
Correct Answer:
Verified
Q85: A system of nonlinear equations is
Q86: Solve the system of equations by substitution.<br>-x
Q87: Graph the system of inequalities.<br>- <span
Q88: Use Gauss-Jordan elimination to solve the
Q89: Write the partial fraction decomposition of
Q91: Use Gaussian elimination to solve the
Q92: A system of nonlinear equations is
Q93: Use Gaussian elimination and matrices to
Q94: Write the partial fraction decomposition of
Q95: Solve the system of equations by substitution.<br>-5x