Multiple Choice
Projects A and B are mutually exclusive and have normal cash flows. Project A has an IRR of 15% and B's IRR is 20%. The company's WACC is 12%, and at that rate Project A has the higher NPV. Which of the following statements is CORRECT?
A) The crossover rate for the two projects must be less than 12%.
B) Assuming the timing pattern of the two projects' cash flows is the same, Project B probably has a higher cost (and larger scale) .
C) Assuming the two projects have the same scale, Project B probably has a faster payback than Project A.
D) The crossover rate for the two projects must be 12%.
E) Since B has the higher IRR, then it must also have the higher NPV if the crossover rate is less than the WACC of 12%.
Problems
Correct Answer:

Verified
Correct Answer:
Verified
Q39: Under certain conditions, a project may have
Q79: Project X's IRR is 19% and Project
Q84: Which of the following statements is CORRECT?<br>A)
Q89: Jazz World Inc. is considering a project
Q91: Kosovski Company is considering Projects S and
Q93: Ingram Electric Products is considering a project
Q94: Noe Drilling Inc. is considering Projects S
Q98: A firm is considering Projects S and
Q99: Which of the following statements is CORRECT?<br>A)
Q104: Assume a project has normal cash flows.All