Multiple Choice
Consider a work center with a demand rate of 15 parts per hour and using a container that can hold 15 parts. It is estimated that the container takes 90 minutes to cycle through the work cell. Assume a safety stock level of 20 percent. What is the value of K for this system?
A) 1
B) 2
C) 3
D) 4
Correct Answer:

Verified
Correct Answer:
Verified