Multiple Choice
Consider a work center with a demand rate of 20 parts per hour and using a container that can hold 5 parts. It is estimated that the container takes 30 minutes to cycle through the work cell. Assume a safety stock level of 10 percent. What is the unrounded value of K for this system?
A) 1.2
B) 2.2
C) 3.2
D) Cannot be determined from the information given