Multiple Choice
A system that calls for subassemblies and components to be manufactured in very small lots and delivered to the next stage in the production process as they are needed is known as a ________ operation.
A) time-maximization-process (TMP)
B) just-in-time (JIT)
C) just-the-right-size (JRS)
D) time-based competition (TBC)
E) computer-integrated manufacturing (CIM)
Correct Answer: