Timing the Work Elements Using the Snap-Back Method Requires

Question 86

Multiple Choice

Timing the work elements using the snap-back method requires:


A) the worker to perform each job element as quickly as possible.
B) a larger sample size than using the continuous method.
C) the use of two stopwatches.
D) a smaller sample size than using the continuous method.

Correct Answer:

verifed

Verified