Multiple Choice
Keith assembles peanut valves and the recorded data is displayed in the table. During one of the cycles, he pauses to answer a phone call from his friend who suggests that he seek employment elsewhere. Keith fields calls with some regularity, but that's not considered part of his routine job responsibilities. What is the select time for this job element?
A) greater than or equal to 3.2 minutes
B) less than 3.2 minutes but greater than or equal to 2.8 minutes
C) less than 2.8 minutes but greater than or equal to 2.4 minutes
D) less than 2.4 minutes
Correct Answer:

Verified
Correct Answer:
Verified
Q14: Are time standards more useful for manufacturing
Q15: Table H.2<br> <img src="https://d2lvgg3v3hfg70.cloudfront.net/TB1252/.jpg" alt="Table H.2
Q16: Time studies are appropriate for setting time
Q17: Name the four steps in a time
Q18: Traditional work measurement techniques are sometimes viewed
Q20: Table H.3<br>A worker was observed for four
Q21: The key to creating a work standard
Q22: Garman observes a worker assembling peanut valves
Q23: A time study analysis was performed on
Q24: When using the MTM approach:<br>A) stopwatches are