Multiple Choice
Table H.1
A worker was observed for four cycles in a repetitive task that contains four distinct elements. The observer recorded the following items in seconds, using the snap-back method:
-The observer assigned a performance rating factor of 1.05 to the worker and the company employs an allowance factor of 15%. What is the select time for Element 1?
A) 5.4 seconds
B) 5.67 seconds
C) 6.52 seconds
D) 7 seconds
Correct Answer:

Verified
Correct Answer:
Verified
Q1: A(n) _ is the time required for
Q2: Table H.1<br>A worker was observed for four
Q3: The _ is a measurement found by
Q4: Table H.1<br>A worker was observed for four
Q5: Keith assembles peanut valves and the recorded
Q7: The _ of job element timing requires
Q8: The performance rating factor in a time
Q9: A time study analyst is determining the
Q10: A work sampling method is used to
Q11: Fatigue, rest, or unavoidable delays are not