Multiple Choice
Table D.2
Bahouth Enterprises produces a variety of hookahs for clients around the globe. Their small plant has a highly flexible workforce that can switch between products seamlessly. They forecast using a six-month planning period and have a demand forecast as shown in the table. The per-unit costs for each output option the sales and operations planner has at his disposal are indicated in the table. Regular output costs $40 per unit, overtime production is $60 per unit, and subcontracting is $70 per unit. Holding inventory from one month to the next costs $2 per unit per month and a backlog costs $5 per unit per month. Regular plant capacity is 300 units per month.
-Use the information in Table D.2. If the plant has no limits on the number of units produced by overtime or subcontractors, what is the lowest-cost chase plan that is possible for the six-month period?
A) less than $50,000
B) between $50,000 and $100,000
C) between $100,000 and $150,000
D) between $150,000 and $200,000
Correct Answer:

Verified
Correct Answer:
Verified
Q20: _ is the amount by which the
Q21: D.5 The Transportation Method<br>Table D.1<br>Tanfastic, Inc., a
Q22: A producer has three products, A, B,
Q23: A very confused manager is reading a
Q24: NYNEX must schedule round-the-clock coverage for its
Q26: In linear programming, a(n) _ is a
Q27: You are faced with a linear programming
Q28: Table D.3<br>The Harper Company is in the
Q29: What is degeneracy in the context of
Q30: A manager is interested in using linear