Solved

A Prime Example of an Internal Failure Cost Is The

Question 85

Multiple Choice

A prime example of an internal failure cost is the:


A) labor cost associated with inspecting every item produced.
B) labor cost associated with repairing an item returned under warranty.
C) material cost of a piece of stock metal that has had too large a hole drilled in it.
D) material cost of the paint applied to the case of a finished unit.

Correct Answer:

verifed

Verified

Unlock this answer now
Get Access to more Verified Answers free of charge

Related Questions