A manufacturer embarking on a Six Sigma program sets the goal of having True Six Sigma capability for all processes by the end of the month. If their current process capability index on a key metric is less than 2.0 and the process capability ratio is 1.0, what must happen with the process standard deviation?
A) The process standard deviation must be doubled.
B) The process standard deviation must be reduced by a factor of six.
C) The process standard deviation must be cut in half.
D) The process tolerances should be doubled.
Correct Answer:

Verified
Correct Answer:
Verified
Q156: Regarding control charts, changing from three-sigma limits
Q157: The process <span class="ql-formula" data-value="
Q158: The defect rate for a product has
Q159: Which step of the Six Sigma DMAIC
Q160: The consultant suspiciously eyed the c-chart that
Q162: When errors have been made while producing
Q163: _ costs arise when a defect is
Q164: _ costs are associated with preventing defects
Q165: How does SPC help companies implement continuous
Q166: A process is monitored with a control