Multiple Choice
A manufacturer embarking on a Six Sigma program sets the goal of having True Six Sigma capability for all processes by the end of the month. If their current process capability index on a key metric is less than 2.0 and the process capability ratio is 1.5, what must happen with the process standard deviation?
A) The process standard deviation must be reduced by 25%.
B) The process standard deviation must be reduced by 33%.
C) The process standard deviation must be reduced by 50%.
D) The process standard deviation must be reduced by 67%.
Correct Answer:

Verified
Correct Answer:
Verified
Q27: Rejecting product materials due to poor quality
Q28: The Six Sigma improvement model can be
Q29: Wider limits on a control chart result
Q30: One of the main challenges in developing
Q31: A quality-focused CEO who promotes a culture
Q33: The defect rate for a product has
Q34: When considering the plan-do-study-act cycle for problem
Q35: Statistical process control (SPC) is the application
Q36: _ is the international standard governing documentation
Q37: A company is interested in monitoring