Multiple Choice
A manufacturer embarking on a Six Sigma program sets the goal of having True Six Sigma capability for all processes by the end of the month. If their current process capability index on a key metric is less than 2.0 and the process capability ratio is 1.25, what must happen with the process standard deviation?
A) The process standard deviation must be reduced by about 25%.
B) The process standard deviation must be reduced by about 37%.
C) The process standard deviation must be reduced by about 50%.
D) The process standard deviation must be reduced by about 67%.
Correct Answer:

Verified
Correct Answer:
Verified
Q34: When considering the plan-do-study-act cycle for problem
Q35: Statistical process control (SPC) is the application
Q36: _ is the international standard governing documentation
Q37: A company is interested in monitoring
Q38: Jerry watched in awe as Warren went
Q40: Which of these elements is not part
Q41: Which of these ISO standards has the
Q42: The underlying statistical distribution for the p-chart
Q43: _ refers to how well the product
Q44: Process capability can be addressed when:<br>A) assignable