Scenario 9.2
Shipments of Product X from a plant to a wholesaler are made in lots of 600. The wholesaler's average demand for X is 100 units per week. The lead time from the plant to the wholesaler is 4 weeks. The wholesaler pays for the shipments when they leave the plant.
-Refer to Scenario 9.2. If the plant reduces its lead time from 4 to 2 weeks and keeps its 600 unit lot size, what is the wholesaler's new total cycle plus pipeline inventories?
A) 300 units
B) 500 units
C) 700 units
D) 200 units
Correct Answer:

Verified
Correct Answer:
Verified
Q64: _ are inventories needed for the production
Q65: Table 9.1<br>Inventory records show the following:<br> <img
Q66: Scenario 9.5<br>Tom Bergman, owner and operator of
Q67: When using ABC analysis, class C SKUs
Q68: Scenario 9.5<br>Tom Bergman, owner and operator of
Q70: Repeatability is an undesirable feature of some
Q71: Scenario 9.3<br>The Talbot Company uses electrical assemblies
Q72: What are the components of holding cost?
Q73: As the annual demand increases, other factors
Q74: Scenario 9.9<br>"Gollee those cats sure go through