Suppose that the following eight jobs must be scheduled through a car repair facility (repair times are shown in days) :
Table 10.8 Suppose that the following eight jobs must be scheduled through a car repair facility (repair times are shown in days) :    -Use the information in Table 10.8 to answer this question. Which job retains the same position in both an EDD and an SPT sequence? A)  A B)  B C)  C D)  G
-Use the information in Table 10.8 to answer this question. Which job retains the same position in both an EDD and an SPT sequence?


A) A
B) B
C) C
D) G