Multiple Choice
In assembly-line balancing, the theoretical minimum number of workstations is:
A) the ratio of the sum of all task times to cycle time.
B) always (when a fraction) rounded upward to the next larger integer value.
C) not always possible to reach when tasks are actually assigned to stations.
D) all of these.
E) none of these.
Correct Answer:

Verified
Correct Answer:
Verified
Q47: Which of the following does NOT support
Q48: Identify the five steps of the work-sampling
Q49: Flexible workweek is a system that allows
Q50: A production line is to be designed
Q51: The separate plants that produce seat belts,
Q53: The assumptions necessary for a successful product-oriented
Q54: What is the primary reason why retailers
Q55: _ allowances are those that account for
Q56: Assembly line balancing has just been used
Q57: What layout strategy deals with low-volume, high-variety