An electronics manufacturer makes remote control devices for interactive-cable-TV systems. The following assembly tasks must be performed on each device.
(a) Draw the precedence diagram for this problem.
(b) What is the sum of the task times?
(c) What cycle time will allow the production of 200 units over a ten-hour day?
(d) What is the theoretical number of workstations needed?
(e) Balance this assembly line using the heuristic most following tasks and the heuristic longest operation time.
(f) How do these two solutions differ? Which do you prefer; why?
Correct Answer:

Verified
The sum of the task times is 4.05 minute...View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Correct Answer:
Verified
View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Q19: List the eight steps used to develop
Q20: Which of the following is NOT one
Q21: One of the elements of ergonomics is:<br>A)
Q22: In the office relationship chart, which rating
Q23: Balancing low-cost storage with low-cost material handling
Q25: In a preliminary work sample of an
Q26: What impact did the Hawthorne studies have
Q27: Maintaining a stable workforce generally results in
Q28: Mutual commitment means that both management and
Q29: Profit-sharing is a motivation and incentive system