Essay
Hemo-tech, Inc., a biomedical technology and research laboratory, produces a standard blood filtering device on an assembly-line basis. Six basic tasks are performed along the assembly line. The time to perform each task and the tasks that must immediately precede each task are in the table below. Twenty pumps per 450-minute day must be produced by the assembly line.
(a) Draw the network diagram of the precedence relationships.
(b) Identify the absolute minimum and maximum cycle times.
(c) What is the cycle time required to meet demand?
(d) What is the minimum number of workstations required to meet the schedule?
(e) Balance this line using the most following tasks heuristic.
(f) What is the efficiency of the line obtained in part (e)?
(g) Can the efficiency of this solution be improved? Explain.
Correct Answer:

Verified
(a) The appropriate diagram appears belo...View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Correct Answer:
Verified
View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Q210: What design guidelines help retail layouts to
Q211: _ often calls for fewer but longer
Q212: Which of the following is NOT an
Q213: Kanbans and flow diagrams are both techniques
Q214: Ambient conditions; spatial layout and functionality; and
Q216: Why do work cells increase the utilization
Q217: Labor standards were pioneered by Frank and
Q218: Which of the following is one of
Q219: The concept of customizing in a warehouse
Q220: _ is the maximum time that the