Multiple Choice
In most acceptance sampling plans, when a lot is rejected, the entire lot is inspected and all defective items are replaced. When using this technique the AOQ:
A) worsens (AOQ becomes a larger fraction) .
B) improves (AOQ becomes a smaller fraction) .
C) is not affected, but the AQL is improved.
D) is not affected.
E) falls to zero.
Correct Answer:

Verified
Correct Answer:
Verified
Q145: Which of the following provides automatic placement
Q146: An acceptance sampling plan must define "good
Q147: Control charts for variables are based on
Q148: Assignable variation:<br>A) is a sign that a
Q149: If the Cpk value suggests a capable
Q151: What is the statistical process chart used
Q152: An acceptance sampling plan is to be
Q153: Define consumer's risk. Is it a Type
Q154: A Type II error occurs when:<br>A) a
Q155: _ is a process analysis technique that