When a Dam and Reservoir Are Constructed,the Natural Response of the River

Question 115

Multiple Choice

When a dam and reservoir are constructed,the natural response of the river and its channel gradient come under the control of


A) the same base level that existed prior to construction.
B) a local,or temporary,base level.
C) the government.
D) an ultimate base level.
E) a calculated base level based on engineering design.