Multiple Choice
Stone Age Surfboards is a small manufacturer of two types of popular low-tide surfboards, the Graystone and the Lava models. The manufacturing process consists of two departments: fabrication and finishing. The fabrication department has 8 skilled workers, each of whom works9.25 hours per day. The finishing department has 5 workers, each of whom works a 6-hour shift per day. Each pair of Graystone surfboards requires 2.5 labor hours in the fabrication department and 2 labor hours in finishing. The Lava model requires 4.2 labor-hours in fabrication and 3.6 labor-hours in finishing. The company operates 6 days a week. It makes a per unit profit of $40 on the Graystone model and $60 on the Lava model. The company anticipates selling at least twice as many Lava models as Graystone models.
Use the spreadsheet below for Stone Age Surfboards to answer the following question(s) using integer constraints on variables in the optimization models using the standard Solver.
-What is the total number of hours used for fabrication?
A) 39.6
B) 34.4
C) 29.2
D) 24.8
Correct Answer:

Verified
Correct Answer:
Verified
Q17: Explain the implementation of a project-selection model.
Q18: Use a modern software tool to
Q19: Formulate and solve optimization models with
Q20: Use a modern software tool to
Q21: Mathematically, a binary variable x can be
Q23: Use a modern software tool to
Q24: is the parameter that specifies when the
Q25: Formulate and solve optimization models with
Q26: Formulate and solve optimization models with
Q27: Formulate and solve optimization models with