Multiple Choice
Use the table below to answer the following question(s) .
Below is a spreadsheet for Stone Age Surfboards.
Assume that the finishing time for a pair of Rockwell surfboards is triangular with a minimum value of 1.4, a most likely value of 1.5, and a maximum value of 1.8 and that finishing time for a pair of Limestone surfboards is also triangular with a minimum value of 1.8, a most likely value of 2.0, and a maximum value of 2.4.The number of trials per simulation is equal to 5000.
-What is the value of mean obtained from the simulation results?
A) 15.65
B) 25.91
C) 20.78
D) 30.42
Correct Answer:

Verified
Correct Answer:
Verified
Q1: Use the table below to answer the
Q2: Use the table below to answer the
Q3: Use the table below to answer the
Q5: Use the table below to answer the
Q6: Use the table below to answer the
Q7: Use the table below to answer the
Q8: Use the table below to answer the
Q9: Use the table below to answer the
Q10: Define a chance constraint.
Q11: Use the table below to answer the