Multiple Choice
If you have reliable economic forecast for five years only, and you would like to evaluate two alternatives with five and six years service lives, the best method to do so is
A) the repeated lives method.
B) the study period method.
C) Both repeated lives method and study period method produce the same result.
D) to choose the alternative with the highest FW.
E) to choose the alternative with the highest PW.
Correct Answer:

Verified
Correct Answer:
Verified
Q41: A manager is considering two technological lines
Q42: NB Power wants to assess the opportunity
Q43: The minimum acceptable rate of return (MARR)is<br>A)an
Q44: A contingent project is an example of<br>A)independent
Q45: Two mutually exclusive projects with the same
Q46: I spend $15 per week on bus
Q47: A municipality decided to build a new
Q48: Christine Robichaud, an engineer at Opus Ltd.,
Q49: I can invest for a pension in
Q51: The best way to compare two projects