As part of a time study, a particular job was analyzed. The study included 20 job cycles and the following cumulative times and performance rating factors for each element were reported: As part of a time study, a particular job was analyzed. The study included 20 job cycles and the following cumulative times and performance rating factors for each element were reported:   Assuming an allowance factor of 15%, the standard time for this job would be A)  4.35 minutes. B)  3.67 minutes. C)  2.712 minutes. D)  2.358 minutes. Assuming an allowance factor of 15%, the standard time for this job would be


A) 4.35 minutes.
B) 3.67 minutes.
C) 2.712 minutes.
D) 2.358 minutes.