Multiple Choice
As part of a time study, a particular job was analyzed. The study included 20 job cycles and the following cumulative times and performance rating factors for each element were reported: Assuming an allowance factor of 15%, the standard time for this job would be
A) 4.35 minutes.
B) 3.67 minutes.
C) 2.712 minutes.
D) 2.358 minutes.
Correct Answer:

Verified
Correct Answer:
Verified