Multiple Choice
Maintenance of the evacuation system includes:
A) flushing the hoses at the end of the day with antimicrobial solution.
B) checking disposable traps weekly and replacing them if needed.
C) opening saliva ejector hoses and cleaning or replacing screens.
D) all of the above.
Correct Answer:

Verified
Correct Answer:
Verified
Related Questions
Q1: The piece of dental dam equipment that
Q2: Which of the following is used the
Q3: To block the flow of saliva and
Q4: The HVE is held using a _
Q6: The HVE suction tip should be positioned:<br>A)after
Q7: The piece of dental floss or dental
Q8: A cotton roll holder is designed to
Q9: Frequent removal of debris as it accumulates
Q10: When removing cotton roll isolation,the dental assistant
Q11: When holes are punched in the dental