Multiple Choice
A methods and measurements analyst needs to develop a time standard for a certain task. In a preliminary study, he observed one of his workers perform this task five times, with the following results:
What is the observed time for this task?
A) 80 seconds
B) 84 seconds
C) 160 seconds
D) 240 seconds
E) 400 seconds
Correct Answer:

Verified
Correct Answer:
Verified