Multiple Choice
A methods and measurements analyst for Timepiece, Inc., needs to develop a time standard for the task of attaching a watch to a wristband. In a preliminary study, he observed one of his workers perform this task five times, with the following results:
What is the standard time for this task if the employee worked at a 20 percent faster pace than average, and an allowance of 20 percent of the workday is used?
A) 20 seconds
B) 24 seconds
C) 25 seconds
D) 28.8 seconds
E) 30 seconds
Correct Answer:

Verified
Correct Answer:
Verified
Q53: The learning curve is a basic tool
Q54: Predetermined time standards use historical data from
Q55: In work sampling, how will increasing the
Q56: A job is expected to have a
Q57: Job enrichment involves giving workers a greater
Q59: Which of the following is not an
Q60: The quickest, most effective way to improve
Q61: Which of the following is not an
Q62: Sometimes improvements in labor requirements are more
Q63: Which of the following statements should not