Solved

A Methods and Measurements Analyst for Digital Devices Needs to Develop

Question 27

Multiple Choice

A methods and measurements analyst for Digital Devices needs to develop a time standard for the task of assembling a computer mouse. In a preliminary study, she observed one of her workers perform this task six times with the following results:
A methods and measurements analyst for Digital Devices needs to develop a time standard for the task of assembling a computer mouse. In a preliminary study, she observed one of her workers perform this task six times with the following results:   What is the observed time for this task? A) 34 seconds B) 40 seconds C) 46 seconds D) 48 seconds E) 240 seconds
What is the observed time for this task?


A) 34 seconds
B) 40 seconds
C) 46 seconds
D) 48 seconds
E) 240 seconds

Correct Answer:

verifed

Verified

Unlock this answer now
Get Access to more Verified Answers free of charge

Related Questions