Multiple Choice
The operations manager for the Blue Moon Brewing Co. produces two beers: Lite (L) and Dark (D) . Two of his resources are constrained: production time, which is limited to 8 hours (480 minutes) per day; and malt extract (one of his ingredients) , of which he can get only 675 gallons each day. To produce a keg of Lite beer requires 2 minutes of time and 5 gallons of malt extract, while each keg of Dark beer needs 4 minutes of time and 3 gallons of malt extract. Profits for Lite beer are $3.00 per keg, and profits for Dark beer are $2.00 per keg.
For the production combination of 135 Lite and 0 Dark, which resource is slack (not fully used) ?
A) time (only)
B) malt extract (only)
C) both time and malt extract
D) neither time nor malt extract
E) cannot be determined exactly
Correct Answer:

Verified
Correct Answer:
Verified
Q88: The production planner for a private label
Q89: In graphical linear programming to maximize profit,
Q90: An electronics firm produces two models of
Q91: LP problems must have a single goal
Q92: A linear programming problem can have multiple
Q94: The production planner for Fine Coffees, Inc.,
Q95: Which of the following could not be
Q96: The production planner for Fine Coffees, Inc.,
Q97: An electronics firm produces two models of
Q98: A change in the value of an