Multiple Choice
The average time before breakdown of a machine is normally distributed and has a mean of nine weeks and a standard deviation of 1.5 weeks. If breakdown cost averages $1,500 and preventive maintenance costs $500, what is the optimal preventive maintenance interval?
A) 3.8 weeks
B) 8.4 weeks
C) 9.6 weeks
D) 6.9 weeks
E) 7.2 weeks
Correct Answer:

Verified
Correct Answer:
Verified
Q6: Preventive maintenance will eliminate the need to
Q7: Breakdown maintenance is _; preventive maintenance is
Q8: Lean purchasing requires frequent contract bidding by
Q9: In the lean approach, inventories are reduced
Q10: A potential obstacle to conversion to a
Q12: Ideally, preventive maintenance will be performed before
Q13: Which of the following is not a
Q14: The major approaches used in plans to
Q15: Kanban is the Japanese term for autonomation.
Q16: A functioning MRP system is required prior