Multiple Choice
The approaches used in lean systems to deal with quality include(I) designing quality into products and processes(II) insisting vendors provide high-quality materials(III) expecting workers to be involved in continuous improvement(IV) training workers in statistical process control(V) 100 percent inspection of raw materials, work-in-process, and finished goods
A) only I
B) only I and II
C) only III and IV
D) only I, II, III, and IV
E) I, II, III, IV, and V
Correct Answer:

Verified
Correct Answer:
Verified
Q44: The small lot-sizing policy works well in
Q45: The four building blocks of lean operations
Q46: Ideally, preventive maintenance will be performed<br>A)after a
Q47: A reactive approach to maintenance is _
Q48: "Autonomation" indicates that the firm is attempting
Q50: Preventive maintenance is generally scheduled on the
Q51: One basis for scheduling preventive maintenance is
Q52: When lean is used in the context
Q53: The goal of maintenance is to maintain
Q54: Which of the following questions is not