Multiple Choice
With regard to suppliers, lean systems typically require
A) delivery of large lots at regular intervals.
B) buyer inspection of goods and materials.
C) multiple sources from which to purchase.
D) long-term relationships and commitments.
E) the lowest price possible.
Correct Answer:

Verified
Correct Answer:
Verified
Related Questions
Q16: A functioning MRP system is required prior
Q17: Fast and simple are two common threads
Q18: The use of small lot sizes in
Q19: For a company with a product mix
Q20: In a pull system, the accumulation of
Q22: _ is known as being a proactive
Q23: Setup time and its associated cost can
Q24: Which of the following is not a
Q25: The average time before breakdown of a
Q26: Increased setup times generally require increased work-in-process