Multiple Choice
The chair of the operations management department at Quality University wants to construct a p-chart for determining whether the four faculty teaching the basic P/OM course are in control with regard to the number of students who fail the course. Accordingly, he sampled 100 final grades from last year for each instructor, with the following results
Using .95 control limits (5 percent risk of Type I error) , which instructor(s) , if any, should he conclude is (are) out of control?
A) none
B) Prof. B
C) Prof. D
D) both Prof. B and Prof. D
E) all
Correct Answer:

Verified
Correct Answer:
Verified
Q85: Patterns of data on a control chart
Q86: A c-chart is used for<br>A)means.<br>B)ranges.<br>C)percent defective.<br>D)fraction defective
Q87: Studies on a machine that molds plastic
Q88: Control limits tend to be wider for
Q89: Statistical process control focuses on the acceptability
Q91: A quality analyst wants to construct a
Q92: Range control charts are used to monitor
Q93: A quality analyst wants to construct a
Q94: This step in the control process includes
Q95: A quality analyst wants to construct a