Multiple Choice
Let x1 , x2 , and x3 be 0-1 variables whose values indicate whether the projects are not done (0) or are done (1) . Which answer below indicates that at least two of the projects must be done?
A) x1 + x2 + x3 2
B) x1 + x2 + x3 2
C) x1 + x2 + x3 = 2
D) x1 -x2 = 0
Correct Answer:

Verified
Correct Answer:
Verified
Q13: Solve the following problem graphically.<br>Min<br>6X +
Q16: Hansen Controls has been awarded a
Q17: If the optimal solution to the LP
Q17: A multiple choice constraint involves selecting
Q18: Grush Consulting has five projects to
Q20: Explain how integer and 0-1 variables can
Q20: Tower Engineering Corporation is considering undertaking
Q27: In a model involving fixed costs,the 0-1
Q41: To perform sensitivity analysis involving an integer