Multiple Choice
Penetration and buildup are controlled more easily with the pipe in the ____ position.
A) 6G 45 degree inclined
B) 2G vertical fixed
C) 5G horizontal fixed
D) 1G horizontal rolled
Correct Answer:

Verified
Correct Answer:
Verified