Solved

What Has to Be Done to Ensure That the Weld

Question 10

Multiple Choice

What has to be done to ensure that the weld has 100% penetration on thick plate or pipe?


A) The part must be preheated to above 350°F (175°C) before welding starts.
B) The welding machine needs to be set on its maximum amperage setting.
C) Make the molten weld pool as large as possible so it will melt all the way through.
D) The edges of the weld plate or pipe must have some type of groove made before welding.

Correct Answer:

verifed

Verified

Unlock this answer now
Get Access to more Verified Answers free of charge