Multiple Choice
Match the definition to the term.
-differential piece-rate system
A) a system in which a standard time was set for each task a worker had to do,those who completed the task in that time or faster got a higher rate of pay,while anyone who did not meet the standard time was penalized
B) the breaking down of skilled labor into standardized tasks through a careful analysis of industrial work
C) working below one's normal capacity or speed
Correct Answer:

Verified
Correct Answer:
Verified
Q33: Match the project with the researcher.<br>-Walter Dill
Q47: Match the project with the researcher.<br>-William Moulton
Q47: Match the project with the researcher.<br>-William Moulton
Q50: The Hollingworths conducted methodologically sophisticated research on
Q51: What were the three foci of Leta
Q52: Identify and state the historical significance of
Q52: What are the Hawthorne studies? Why are
Q53: Who thought that workers should be able
Q72: Match the project with the researcher.<br>-Lillian Gilbreth<br>A)assessed
Q72: Match the project with the researcher.<br>-Lillian Gilbreth<br>A)assessed