-Formulate the following problem as a linear programming problem (DO NOT SOLVE):A steel company
produces two types of machine dies, part A and part B. Part A requires 6 hours of casting time and 4 hours of
firing time. Part B requires 8 hours of casting time and 3 hours of firing time. The maximum number of hours
per week available for casting and firing are 85 and 70, respectively. The company makes a $2.00 profit on each
part A that it produces, and a $6.00 profit on each part B that it produces. How many of each type should the
company produce each week in order to maximize its profit? (Let x1 equal the number of A parts and x2 equal
the number of B parts produced each week.)
Correct Answer:

Verified
Correct Answer:
Verified
Q8: Use graphical methods to solve the linear
Q9: Graph the inequality.<br>-<img src="https://d2lvgg3v3hfg70.cloudfront.net/TB8591/.jpg" alt="Graph the inequality.
Q10: Solve the problem.<br>-The Old-World Class Ring Company
Q11: Use graphical methods to solve the linear
Q12: Solve the problem.<br>-A salesperson has two job
Q14: Use graphical methods to solve the linear
Q15: Graph the inequality.<br>-<img src="https://d2lvgg3v3hfg70.cloudfront.net/TB8591/.jpg" alt="Graph the inequality.
Q16: Graph the constant-profit lines through (3, 2)
Q17: Provide an appropriate response.<br>-Refer to the following
Q18: Provide an appropriate response.<br>-Using a graphing calculator