Multiple Choice
Set up the linear programming problem.
-A steel company produces two types of machine dies, part A and part B and is bound by the followingconstraints:∙ Part A requires 1 hour of casting time and 10 hours of firing time.∙ Part B requires 4 hours of casting time and 3 hours of firing time.∙ The maximum number of hours per week available for casting and firing are 100 and 70, respectively.∙ The cost to the company is $0.75 per part A and $3.00 per part B. Total weekly costs cannot exceed $45.00.Let x = the number of part A produced in a week and y = the number of part B produced in a week. Writea system of three inequalities that describes these constraints.
A)
B)
C)
D)
Correct Answer:

Verified
Correct Answer:
Verified
Q25: Solve the system of equations by substitution.<br>-<img
Q26: Solve the system of equations by substitution.<br>-<img
Q27: Solve the system of equations. If the
Q28: Verify that the values of the variables
Q29: Write the word or phrase that best
Q31: Graph the inequality.<br>-<img src="https://d2lvgg3v3hfg70.cloudfront.net/TB8253/.jpg" alt="Graph the inequality.
Q32: Write the word or phrase that best
Q33: Solve the system of equations using matrices
Q34: Write the word or phrase that best
Q35: Write the word or phrase that best