Multiple Choice
NEC 701.12( G ) ____ the connection for a legally required standby system to be made ahead of, but not within, the main service disconnect.
A) mandates
B) disallows
C) permits
D) discourages
Correct Answer:

Verified
Correct Answer:
Verified
Related Questions
Q8: Fuels that may be used in an
Q9: Manufacturers of generators, transfer switches, and signaling
Q10: What is a legally required standby system?
Q11: What is the mechanism behind the generation
Q12: In a typical branch-circuit installation for an
Q14: When are self-contained emergency power systems used?
Q15: According to NEC <sup></sup> 110.9 , switches
Q16: There have been many injuries and deaths
Q17: What are the advantages and disadvantages of
Q18: Why is it important to accurately determine