Multiple Choice
The ____ lines can be saved, even after the corner stakes are removed for earthwork, by erecting batter boards.
A) site
B) building
C) leader
D) dimension
Correct Answer:

Verified
Correct Answer:
Verified
Related Questions
Q15: A _ line on each side of
Q16: Topsoil should be stripped from the area
Q17: Concrete footings are placed on _ to
Q18: In masonry foundations, steps in footings are
Q19: The building lines are extended and marked
Q20: _ boards are sturdy horizontal boards fastened
Q22: Sometimes the the concrete footings are placed
Q23: Setting up a laser level is very
Q24: The size of the footing may be
Q25: The footing may be _ to accommodate