Multiple Choice
The ____ (vertical part through the floor) and drain basin are usually set at the proper elevation just prior to placing the concrete floor.
A) riser
B) pole
C) climber
D) elevation
Correct Answer:

Verified
Correct Answer:
Verified
Related Questions
Q14: _ means filled with earth to the
Q15: The weight and rigidity of the floor
Q16: A(n) _ is a mass of dense
Q17: If the note on a concrete apron
Q18: <img src="https://d2lvgg3v3hfg70.cloudfront.net/TBX9360/.jpg" alt=" The central symbol
Q19: At one time, clay drain tile was
Q20: The thickness of polyethylene sheeting is measured
Q22: Expansion joints can be made from any
Q23: Underground utility systems do not have to
Q24: Footing drains are usually perforated _ pipe