Multiple Choice
Where nonmetallic-sheathed cable is installed through metal studs or floor joists, a ____ or grommet must be installed prior to installing the cable.
A) bolt
B) truss
C) sill
D) bushing
Correct Answer:

Verified
Correct Answer:
Verified
Related Questions
Q6: The number of joists and headers required
Q7: The technique used extensively for balconies, under
Q8: Metal floor joists are rarely used in
Q9: In the simplest building, _.<br>A) joists are
Q10: The size, direction, and spacing of floor
Q12: Sill sealer is incompressible.
Q13: _ framing consists of joists that project
Q14: The entire construction of the floor frame
Q15: The size and spacing of material to
Q16: Sometimes joists are cut to form an