Multiple Choice
In areas with little seismic activity it is not customary t for construction drawings to specify nailing schedules, but in high seismic areas nailing is typically specified by the ___________engineer.
A) Soil engineer
B) architect
C) structural engineer
D) seismic expert
Correct Answer:

Verified
Correct Answer:
Verified
Q5: The information on sill plate thickness, nailing
Q6: Wood is a very unforgiving material in
Q7: Any building in earthquake country needs to
Q8: _ involves the placement of a grid
Q9: _are manufactured in a variety of configurations;
Q11: Once the concrete is placed, it is
Q12: The report also provides the structural engineer
Q13: The standard shear resisting method used for
Q14: Structures built on rock perform better than
Q15: Schedules use different shapes, such as _